Managed roadways for the I-210 pilot
The following map is drawn from the I-210 Concept of Operations (ConOps). This map includes all managed roadway sections in the first phase of the project area. The corridor section extends from the SR-134 interchange in the west to the I-605 interchange in the east and includes the major arterials from Huntington Drive and Duarte Road in the south to Orange Grove and Foothill Blvd. in the north, passing through the cities of Pasadena, Arcadia, Monrovia, and Duarte.