Once the planning phase has been completed, the project team can begin work on developing the ICM system. This includes:
- Defining the system requirements
- Creating the system validation plan
- Designing system components
- Coding system software
- Fabricating and assembling hardware components
- Testing system components
- Integrating and verifying the system
While listed here as a linear sequence, these steps in fact often overlap, proceed in parallel, and interact in essential ways. They fall under:
- the Development and Implementation stage of ICM
- the middle phases of the systems engineering process
- core tasks midway through the Connected Corridors project timeline
Use the links in the sidebar to see how the Connected Corridors team undertook these development activities.